| Heacham
& Hunstanton Sea Defence Strategy |
|
Page 4 |
| The
templates for the steps are shown in the distance and you can see how far down the steps go |
Now into November 2002 and high winds have blown down the back fence |
| Oh and that portable toilet also gets blown over | The lighting is
ready for use to make sure the work is going to plan, Christmas is not far off |
| Things taking shape and light at the end of the tunnel | There are always people taking photos |
|
The first signs of winter as
high winds and |
Into late January and the photo
above shows |